Resume

[ Home | Contents | Search | Post | Reply | Next | Previous | Up ]


Resume

In need of a job

From:
FName:
LName:
Title:
Address1:
Address2:
City:
State: -- select one --
Province:
Country: US
Zip:
Phone:
Fax:
Email:
Travel: No
Relocate: No
Citizenship: Yes
Date: 7/11/2005
Time: 4:46:26 PM
Remote Name: 169.133.253.10

Cover

Description

Comments

From: David K. Bodiford
FName: David
LName: Bodiford
Title: General Manager
Address1: Rt 1 Box 2080
Address2:
City: Fort Gibson
State: Oklahoma
Province:
Country: US
Zip: 74434
Phone: 918-686-8754
Fax: 918-686-8754
Email:
Travel: Yes
Relocate: Yes
Citizenship: Yes
Date: 2/3/2003
Time: 1:40:47 PM
Remote Name: 63.156.72.27

Cover

Gentlemen: My name is David K. Bodiford and I have 21 years of food processing experience in many different environments. The skills I have developed in team based systems, process improvement, lean manufacturing, and project management, have allowed me to make significant operational improvements within the organizations I have worked. I would like to opportunity to present my qualifications and look forward to further discussing our mutual interests. Regards, David K. Bodiford

Description

David K. Bodiford Rt. 1 Box 2080 Fort Gibson, OK 74434 HM# (918) 686-8754 CELL# (918) 527-3536 dbodi4d@msn.com Summary: Twenty-one years of Food processing experience with twelve years in the Plant Manager/General Manager Role. I have worked in union and non-union facilities, self-directed and traditional facilities, Plant start-ups, and redesigned traditional facilities. Known for my expertise in the transitioning of traditional facilities into High Performance Systems, thus reducing manufacturing costs while simultaneously improving quality. Objective: To become a member of an organization where I can utilize my skills in leading a large facility or multiple facilities to continuously outperform the competition with fewer resources. Education: B.S. Industrial Engineering Oklahoma State University 1978 Professional Development: Fluent in all Microsoft applications, extensive training in Organizational Design, Optimizing Production Systems through Variance Analysis, and Project management. Experience 2001 – Present Whitlock Packaging Corp. – a large hot fill and aseptic beverage co- packer General Manager – Fort Gibson OK - $50 mil co-packing operation for Customers such as Pepsi, Nestles, and Campbell’s, with 325 personal producing 20 million cases annually. • Responsible for all manufacturing both hot fill and aseptic in a 700,000 sq. ft. facility • Reduced recordable accidents by 60% • Reduced labor costs by 10% first year through improved efficiency • Implemented a Project Management Process to bring projects in on time and under budget 1999- 2000 Northland Cranberries – a $300 mil company in the 100% juice market General Manager – Bridgeton NJ - $150 mil operation 265 personnel producing 9 million cases a year • Responsible for all functions of two manufacturing operations • Reduced recordable accidents by 70% • Reduced costs by 25% • Plant closed in Nov. 2001 1999-1999 Omega Protein – a $500 mil company specializing in marine protein and oil. General Manager/VP Operations in Training – Morgan City LA – 300 personnel fishing and processing operation that produced fish protein and oil for both animal and human consumption • Managed $3 mil in Capital projects • Plant closed in September 1999 Page 2 1995-1999 Cliffstar Corporation – a $400 mil company that is the largest producer in the private label fruit juice market. Plant Manager – Joplin MO – a $100 mil facility with 125 personnel and 6 million cases of production • This was a turnaround situation for a facility that was two year old. • Reduced recordable accidents by 90% and achieved over a million man hrs without a lost time accident • The re-design resulted in a 25% reduction in cost per case, improved quality, and reduced turnover 1991-1995 Wilsey Foods - $500 mil company providing fats and oils for the foodservice industry Plant Manager – St. Joseph MO – A Greenfield site. • Project Manager during the construction phase of this $15 million facility • Designed the organizational structure for this team based facility • This project was able to produce at half the cost of its sister facilities • Only 1 recordable accident 1989-1991 IBP - $12 billion Company that is the leading producer of fresh beef and pork with 26 plants and 25,000 employees. Director of Improved Management Process – Corporate office – Dakota City, NE • Focused on Engineering and Organizational design projects throughout the company • Projects resulted in a $93 million savings 1986-1989 Nabisco Brands – a $2 billion division of Nabisco Inc. Production Manager – Buena Park, CA – a 300 union employee cookie and cracker facility • Responsible for all production in a 3 shift operation • Implemented SPC thus reducing manufacturing costs by $90,000 1981-1986 Frito-Lay – a division of PepsiCo and the leading producer of salty snack foods Technical Services Manager 1985-1986 – Bakersfield CA – A Greenfield site • Designed and Implemented all quality systems in a start-up team based facility • Conducted R&D work on new equipment which resulted in producing the best quality in the nation Product Manager 1983-1985 – San Jose CA – a 200 union employee facility • Responsible for one product, 3 shifts operation First Line Supervisor 1981-1983 – San Jose CA • Responsible for the production of 1 shift processing and packaging 1978-1981 U.S. Army Captain Infantry Airborne Ranger • Honorable Discharge

Comments


Last changed: August 08, 2008